
| Task: | Reconstruction and redesign façade and roof |
| Building cost: | 2.0 Mio. EUR |
| Realization: | 2007 |
The existing building was built in the mid 50es, designed in the common East German “Stalinistic” style. The goal for the façade reconstruction was a contemporary light interpretation of the strong style and identity of the architecture. Green prefab concrete frames adopt the existing design and translate it into more elegance.














